Key takeaways

  • A CRM migration is three separate problems: schema mapping, data migration, and workflow reconstruction. Treating them as one project is why migrations overrun.
  • Run a parallel period. For at least two weeks, both CRMs are source-of-truth for different things. Yes it’s painful. Yes it’s the only way to catch the edge cases.
  • Validate by count, then by sample, then by field. Row-count mismatches surface structural bugs. Sampling surfaces data-shape bugs. Field-level diffs surface mapping bugs. Do them in that order.
  • Custom fields are where migrations go to die. Plan two days to map them, not two hours.
  • Freeze the old system the moment you cut over. Do not leave it writable as a “safety net” — you’ll end up with two divergent sources of truth and a week-long reconciliation.

Migrations off legacy CRMs fail the same way every time. Someone exports a CSV, someone else imports it into the new system, the founder flips the switch at 5pm on a Friday, and by Monday morning the sales team is rebuilding workflows from memory while invoices are getting sent to deleted contacts.

This isn’t because CRM migrations are mysterious. It’s because they’re three problems pretending to be one. This post is the playbook we’d recommend teams run. None of it is Conduyt-specific — if you end up picking a different CRM, this still applies.

1. The three-problem framing

A CRM migration looks like “moving data from system A to system B.” It isn’t. It’s three independent problems:

  1. Schema mapping — figuring out how Contacts in A correspond to Contacts in B, where each custom field goes, what the status taxonomy looks like on the other side.
  2. Data migration — actually moving the rows. Relatively mechanical once schema is settled.
  3. Workflow reconstruction — rebuilding every automation, integration, report, and dashboard your team relied on. This is 60% of the effort and usually gets 10% of the planning.

Treating these as one project produces surprises. Budget for them separately, staff them separately, ship them in order. Schema first, data second, workflows last — and workflows can be iterative while the team is already live on the new system.

2. Before you export: the inventory

Before anyone touches an export button, write down what you actually have. Every legacy CRM accumulates junk — dead custom fields from a 2019 campaign, user accounts for people who left, test records from the initial setup.

The inventory you need:

Two to three days for inventory. It pays for itself immediately in reduced migration scope.

3. Schema mapping: the spreadsheet that saves your project

Open a spreadsheet. Columns: Source object, Source field, Source type, Target object, Target field, Target type, Transform, Notes.

Fill in every row. Every custom field, every system field, every relationship. This is boring. Do it anyway — the spreadsheet is what your migration script will execute against, and it’s what you reference six months later when someone asks “why is this field named this way?”

Common transforms that look innocent and aren’t:

The mapping spreadsheet takes a week if you’re methodical. Skipping it takes a month of debugging.

4. Custom fields will hurt

Reserve the most time for custom fields. They look simple in the spreadsheet — Text maps to Text, right? — but they carry the most business logic and the most edge cases.

Three patterns that burn migrations:

Assume two full days of work just for the custom-field pass.

5. Shadow writes and parallel run

Before you cut over, run both systems in parallel for at least two weeks. The cost is real — someone has to maintain both — but the cost of cutting over without a parallel period is worse.

Two shapes of parallel run, depending on your appetite:

For most teams, one-way shadow writes plus a bi-directional sync on just the Contact object is the sweet spot. You get the “no lost records” property for the highest-stakes object, without the full complexity of dual-write for everything.

Use the parallel period to:

End the parallel period when everyone can answer “which system do I check?” the same way for a given question. If the answer is still “it depends,” you’re not ready.

6. Validation in three passes

Don’t validate by eyeballing. Do it in three structured passes:

Pass 1 — Count validation. For every object, row count on source should equal row count on target. If it doesn’t, you have a structural bug (filter misconfigured, relationship dropped, etc.). Do not proceed to pass 2 until counts match.

-- Count validation SQL — run on both sides, compare
SELECT
  'contacts' AS object, COUNT(*) AS row_count FROM contacts
UNION ALL
SELECT 'deals', COUNT(*) FROM deals
UNION ALL
SELECT 'companies', COUNT(*) FROM companies
UNION ALL
SELECT 'activities', COUNT(*) FROM activities;

Pass 2 — Sample validation. Randomly pick 50 records of each object. For each, compare side by side. If any of the 50 diverge, expand the sample or diff at field level to find the pattern.

Pass 3 — Field-level diff for high-stakes records. Every record of strategic value — your largest accounts, your top-of-pipeline opportunities, your named customers — gets diffed field-by-field. This catches the custom-field mapping bugs that slip through count + sample.

A migration script that passes all three passes on a sample probably isn’t broken. A script that passes count but fails sample has a data-shape bug. A script that passes sample but fails field-level for big accounts has a mapping bug for a rarely-set field.

7. Workflows and automations

This is the part teams underestimate. You rebuild every automation from scratch on the new system — there’s no automated way to translate, say, a GHL trigger into a Conduyt workflow. The triggers, conditions, and actions don’t map 1:1.

Structure the rebuild:

A rough scaling rule: if you had 20 active automations on the legacy system, assume you’ll end up with 12 on the new one after the cleanup. The 8 missing are drift.

8. Integrations: cut deliberately, not all at once

Integrations are the most dangerous part of a cutover because they’re mostly invisible. Something stops firing, you don’t notice until the monthly report is wrong.

Do not move all integrations at once. Do this instead:

  1. Inventory them (from step 2).
  2. Classify each by criticality: lead-capture (high), internal Slack pings (medium), reporting dashboards (low).
  3. Cut over one at a time, starting from lowest criticality. That way if something breaks, the impact is a stale dashboard, not lost leads.
  4. Monitor each for 48 hours after cut. Then move the next one.

If the integration owner isn’t on your team — a Zap that your CMO built, say — include them in the cutover conversation. They need to know what broke and where the new endpoint lives.

9. The cutover day

Cutover is the easy part if the prior steps went well. A short playbook for the day itself:

Do not treat cutover as “project over.” The first week on the new system is when you find the last 5% of migration issues that didn’t surface during parallel run.

10. Patterns that come up most in CRM migrations

A couple of patterns worth calling out specifically, because they come up in most CRM migrations:


Closing

A good CRM migration ends with your team not noticing they moved. That’s an achievable bar if you spend more time in the spreadsheet than in the export button, run a real parallel period, and validate in structured passes. Most of the work happens before anyone clicks “import.” Most of the mistakes happen when that order gets reversed.